The first hopper load of dredged silts form Bembridge Marina since 2013 leaves the Harbour at 9.30 this morning. This has to be good news as the SHA move to meet their admirable target depth of 1.8 meters at low tide with around 20 “Bennetts” being removed on each trip to the Nab dumping grounds.
